Skip to main content

Prompt: ISO-week launches with emails that match the clock

Paste this into Claude Code, Cursor or Codex inside your repo. The agent puts ISO week math in one module, keeps future-week pages public, and wires reminder / go-live / recap / ranking emails to that same Monday-Sunday UTC clock.


Copy prompt

The prompt

Paste it into an agent that has your repo open. It plans first and waits for your OK before writing code.

97 lines · ~1,416 tokens

Or paste one line

Fetch https://www.scrolllaunch.com/prompts/launch-week-engine.md and carry out the prompt in its "Prompt" section on this repo. Show me your plan before writing code.

For agents that can fetch URLs. The agent pulls the full prompt from this page's markdown version, which includes the last step above.

What you get

What your repo has when the agent is done

  • One ISO week helper (YYYY-Www, zero-padded, Monday 00:00 UTC) used by routes, crons and email
  • Scheduled objects have a public URL, sit in the sitemap and upcoming index, and stay off this week's board
  • Reminder ~24h before Monday, go-live on week start, one early-week nudge, recap after Sunday
  • Ranking email only to people the week-end job actually ranked
  • /week hub and /week/<year>/<week> for each ISO week
  • Tests for zero-padding, stamps, and 'this week' vs upcoming

The result

ScrollLaunch ships the same setup

These are live on this site. Open them to see what a passing result looks like.

How to use

4 steps from paste to deploy

  1. 1

    Open your repo in a coding agent

    Claude Code, Cursor (agent mode), Codex or Windsurf, with the existing date helpers and cron folder visible.

  2. 2

    Paste the prompt and read the week-clock table

    Cut any email that doesn't have a matching object. Confirm storage will be zero-padded `YYYY-Www`.

  3. 3

    Say OK, then open a future-week URL

    It should 200. This week's board should not list it. The reminder query should not match it yet.

  4. 4

    Check the converter

    Open the ISO week tool and confirm a date in your campaign matches the string the helper formats.

Next

Shipped it? Put it in front of people

Launch on ScrollLaunch

A week on the leaderboard and a permanent product page with a markdown version that AI agents can read. Free launches get a dofollow backlink while the badge stays on your site.

Questions

Launch-week engine prompt FAQ

Why not calendar months?

A launch on the 31st and one on the 1st are different months and the same weekend. ISO weeks give every participant the same Monday-Sunday window in UTC.

Should scheduled pages be noindex until launch day?

No. People search for the product's name. Keep the page indexable with a 'goes live Week N' callout, and hold the outbound perk (dofollow, live badge) until the week starts.

Do I need the email-funnel prompt too?

This one is the week clock. The lifecycle-funnel prompt is the state machine around it (verify, first milestone, missing badge). Run this first if you don't have ISO weeks yet.

More prompts

Other prompts